Summary
100% of all REPORTED Findings have been addressed
- 0Acknowledged
- 0Risk Accepted
- 1Solved
- 1All Findings
- Critical0
- High0
- Medium1
- 1Solved
- Low0
- Informational0
Introduction#
The 1kx team engaged Halborn to conduct a security assessment on their smart contracts and circuits, beginning on May 20, 2024, and ending on May 31, 2024. The security assessment was scoped to the smart contracts and circuits inside their zksafe GitHub repository, located at https://github.com/1kx-network/zksafe/blob/main, commit 5d55130d7a9deddf15025a479dff65ba8582def6.
Assessment Summary#
The team at Halborn was provided two weeks for the engagement and assigned two full-time security engineers to assess the security of the smart contracts and the zero knowledge circuits. Both security engineers are blockchain, smart-contract, and ZK security experts with advanced penetration testing, smart-contract hacking, and deep knowledge of multiple blockchain protocols.
The purpose of this assessment is to achieve the following:
Ensure that the system operates as intended.
Identify potential security issues.
Identify lack of best practices within the codebase.
Identify systematic risks that may pose a threat in future releases.
Identify common ZK issues found in ZK circuits.
In summary, Halborn identified one security issue that was addressed by the 1kx team.
Test Approach and Methodology#
Halborn performed a combination of manual and automated security testing to balance efficiency, timeliness, practicality, and accuracy in regard to the scope of this assessment. While manual testing is recommended to uncover flaws in logic, process, and implementation; automated testing techniques help enhance coverage of the code and can quickly identify items that do not follow the security best practices. The following phases and associated tools were used during the assessment:
Research into architecture and purpose.
Smart contract manual code review and walkthrough.
Graphing out functionality and contract logic/connectivity/functions (
solgraph).Manual assessment of use and safety for the critical Solidity variables and functions in scope to identify any arithmetic-related vulnerability classes.
Manual testing by custom scripts.
Static Analysis of security for scoped contract, and imported functions (
slither).Testnet deployment (
Foundry).Running ZK tests with
nargo.
Risk Methodology#
4.1 EXPLOITABILITY
Attack Origin (AO):
Attack Cost (AC):
Attack Complexity (AX):
Metrics:
| EXPLOITABILITY METRIC () | METRIC VALUE | NUMERICAL VALUE |
|---|---|---|
| Attack Origin (AO) | Arbitrary (AO:A) | 1 |
| Specific (AO:S) | 0.2 | |
| Attack Cost (AC) | Low (AC:L) | 1 |
| Medium (AC:M) | 0.67 | |
| High (AC:H) | 0.33 | |
| Attack Complexity (AX) | Low (AX:L) | 1 |
| Medium (AX:M) | 0.67 | |
| High (AX:H) | 0.33 |
4.2 IMPACT
Confidentiality (C):
Integrity (I):
Availability (A):
Deposit (D):
Yield (Y):
Metrics:
| IMPACT METRIC () | METRIC VALUE | NUMERICAL VALUE |
|---|---|---|
| Confidentiality (C) | None (C:N) | 0 |
| Low (C:L) | 0.25 | |
| Medium (C:M) | 0.5 | |
| High (C:H) | 0.75 | |
| Critical (C:C) | 1 | |
| Integrity (I) | None (I:N) | 0 |
| Low (I:L) | 0.25 | |
| Medium (I:M) | 0.5 | |
| High (I:H) | 0.75 | |
| Critical (I:C) | 1 | |
| Availability (A) | None (A:N) | 0 |
| Low (A:L) | 0.25 | |
| Medium (A:M) | 0.5 | |
| High (A:H) | 0.75 | |
| Critical (A:C) | 1 | |
| Deposit (D) | None (D:N) | 0 |
| Low (D:L) | 0.25 | |
| Medium (D:M) | 0.5 | |
| High (D:H) | 0.75 | |
| Critical (D:C) | 1 | |
| Yield (Y) | None (Y:N) | 0 |
| Low (Y:L) | 0.25 | |
| Medium (Y:M) | 0.5 | |
| High (Y:H) | 0.75 | |
| Critical (Y:C) | 1 |
4.3 SEVERITY COEFFICIENT
Reversibility (R):
Scope (S):
Metrics:
| SEVERITY COEFFICIENT () | COEFFICIENT VALUE | NUMERICAL VALUE |
|---|---|---|
| Reversibility () | None (R:N) | 1 |
| Partial (R:P) | 0.5 | |
| Full (R:F) | 0.25 | |
| Scope () | Changed (S:C) | 1.25 |
| Unchanged (S:U) | 1 |
| Critical | High | Medium | Low | Informational |
| 9 - 10 | 7 - 8.9 | 4.5 - 6.9 | 2 - 4.4 | 0 - 1.9 |
Scope#
Assessment Summary & Findings Overview#
# | Title | Severity | Score | Status |
|---|---|---|---|---|
| Loss of ETH when executing a transaction from the module | Medium | 6.3 | Solved05/30/2024 |
Findings & Tech Details#
Description
Proof of Concept
Recommendation
Remediation Comment
8. Automated Testing#
Disclaimer#
Halborn strongly recommends conducting a follow-up assessment of the project either within six months or immediately following any material changes to the codebase, whichever comes first. This approach is crucial for maintaining the project’s integrity and addressing potential vulnerabilities introduced by code modifications.